When you're ready to put the remodeled kitchen back together, we recommend this order of steps to complete your renovation:
  • Configure plumbing and electrical. ...
  • Paint the room.
  • Install new flooring.
  • Add kitchen cabinets.
  • Install countertops.
  • Place large appliances.
  • Fasten cabinet hardware.
  • Put in the backsplash.
Jul 17, 2021

What is the first step in a kitchen remodel?

1. Tear Out and Demolition. The first step of any kitchen remodel is tear out and demolition. Before you are ready to create a beautiful new space, it is important to demolish and get rid of what’s outdated or worn out.

How to insulate windows with caulking?

Simply take the time to wipe down your old ones with a good cleaner and seal any existing cracks around the windows with caulking to help insulate more effectively. If you’re adding new doors or windows to the space, make sure to insulate them properly.

What to do after rough in?

After you’ve finished the rough-in work, it is time for a professional inspection. In most cases, this simply requires calling the city or county and scheduling an appointment. For some areas, there might be a small fee involved.

What should be included in a home inspection?

The home inspection should include the heating system, air-conditioning or HVAC system, interior plumbing, electrical system, the roof, the attic, any visible insulation, walls, ceilings, flooring, windows, doors, foundation, sewer line, and the basement.

What should be included in a checklist?

Include both interior (walls, paint, etc.) and exterior items (e.g. landscaping, gutters, and outside lighting). The checklist should be very detailed and describe everything that needs to be done to the property. The inspection report can be used to generate the checklist.

Why do you need to put flooring in rehab?

The flooring is installed later in the rehab process to avoid getting paint on the floor and to avoid damage from workers going in and out of the house. Because you want your floors to look fresh when you're finished, you might consider doing the bulk of the interior work before installing flooring.

What is a pre-screen question?

Pre-screen any candidate to determine if he or she is a good fit for your project. Pre-screen questions should cover these considerations: A contractor's experience: you want at least three years. Equipment: a contractor should have his/her own equipment. Employees: you want to see adequate support to complete the job.

What to do when you have a house in a building?

Begin with demolition and trash removal. Remove any trash inside or outside the building. Remove any items that are damaged or that you will be replacing (flooring, cabinets, appliances, light fixtures, toilets, water heaters, etc.) Outside work may include trimming any dead trees or bushes and removing garage doors, fencing, sheds, decks, and siding.

What is the best way to change the look of a house?

Install light fixtures, flooring, and appliances (stoves, dishwashers, washing machines, dryers, etc.) Lighting is a great way to change the look of a property and is relatively inexpensive compared to other repairs. Flooring may include vinyl or ceramic tile, hardwood, carpet, or laminate.

How to make a property look less like a construction site?

New windows and doors will also make the property look less like a construction site. Count the number of doors and windows you will need, and take measurements before you purchase the items. Measure very carefully. New entry doors are a nice way to change the look of a property and add value.

Why should product orders be made well in advance of the time needed?

Some product orders should be made well in advance of the time there are needed because production and delivery times can vary widely and unpredictably. If a product is not delivered by the time it is needed, a project will often come to a complete standstill.

What are the products of a kitchen?

Products include cabinets, appliances, imported stone and tile, custom made products and granite or marble slabs. If possible, side aside storage space for items to be delivered and held until needed, ideally indoors in a temperature controlled space. Construction of any new walls or doorways.

Can you do texture before painting?

Drywall & texture - texturing can be done just before painting, but is typically faster and easier if done now when kitchen is empty. Underfloor heating installed. Flooring - once new flooring is installed, protective safeguards are needed to avoid damage from construction.

Can a cabinet be delivered a day later than needed?

A cabinet delivered a day later than needed can knock a project off schedule by a week or two or more in some situations. The following timeline is for a typical project, but it can vary by builder and community practices. It should be used as a general overview.

Account Closed

Exterior structural, structural, functional, cosmetic. ( some variations, but generally true)

Account Closed

Just purchased my first SFH rental off-market. Needs extensive work but don't know true extent. I do know it needs P/B foundation repair, new tile, and plumbing updates.

image
A B C D E F G H I J K L M N O P Q R S T U V W X Y Z 1 2 3 4 5 6 7 8 9